| Citation: | FU Xu-yun, CHEN Yin, ZHONG Shi-sheng. Approach for civil aero-engine repair objective determination based on life limited parts[J]. Journal of Aerospace Power, 2014, (7): 1556-1561. doi: 10.13224/j.cnki.jasp.2014.07.006 |
| [1] |
冉隆吉.飞机维修成本标准化控制初探[J].航空维修与工程,2009(6):44-45. RAN Longji.A probe into maintenance cost solution on a standardized basis[J].Aviation Maintenance and Engineering,2009(6):44-45.(in Chinese)
|
| [2] |
付旭云.机队航空发动机维修规划及其关键技术研究[D].哈尔滨:哈尔滨工业大学,2010. FU Xuyun.Aeroengines in a fleet oriented maintenance programming and its key technologies .Harbin:Harbin Institute of Technology,2010.(in Chinese)
|
| [3] |
Goh S,Coleman C P.Sustainment of commercial aircraft gas turbine engines:an organizational and cognitive engineering approach[R].AIAA-2003-6816,2003.
|
| [4] |
Air Force Research Laboratory.Work scope optimization tool contributes to lower maintenance costs and higher reliability in aircraft engines[EB/OL].[2013-04-20].http://www.afsbirsttr.com/Publications/Documents/Advantage2&3Q2009.pdf.
|
| [5] |
National Center for Manufacturing Sciences.Engine workscope optimization for improved reliability and reduced fuel consumption[EB/OL].[2013-04-20].http://ctmaideas.ncms.org/ideas/project_detail.asp?Project_ID=181.
|
| [6] |
AerData Group.IT systems to manage and optimise engine maintenance[J].Aircraft Commerce,2011(76):45-51.
|
| [7] |
ZHANG Haijun,ZUO Hongfu,LIANG Jian.Maintenance level decision of aero-engine based on VPRS theory[J].Transactions of Nanjing University of Aeronautics and Astronautics,2005,22(4):281-284.
|
| [8] |
雍成喜.民航发动机送修方案制定及其应用系统开发 .南京:南京航空航天大学,2008. YONG Chengxi.Research and development of civil aero engine shop visit planning system .Nanjing:Nanjing University of Aeronautics and Astronautics,2008.(in Chinese)
|
| [9] |
汤新民.基于Petri网的航空发动机车间维修过程建模及其应用研究 .哈尔滨:哈尔滨工业大学,2007. TANG Xinmin.Aero-engine workshop maintenance procedure modeling based on Petri nets and its application[D].Harbin:Harbin Institute of Technology,2007.(in Chinese)
|
| [10] |
WANG Jianrong,YU Tianbiao,WANG Wanshan.Integrating analytic hierarchy process and genetic algorithm for aircraft engine maintenance scheduling problem[C]//Advances in Intelligent and Soft Computing.Berlin:Springer-Verlag,2010:897-915.
|
| [11] |
索海波.CFM56发动机送修等级决策分析模型研究[D].四川,广汉:中国民用航空飞行学院,2012. SUO Haibo.Analysis model studies on maintenance level decision of CFM56 engine[D].Guanghan,Sichuan:Civil Aviation Flight University of China,2012.(in Chinese)
|
| [12] |
付旭云,钟诗胜,丁刚.民用航空发动机单元体送修工作范围决策[J].航空动力学报,2010,25(10):2195-2200. FU Xuyun,ZHONG Shisheng,DING Gang.Civil aero-engine module workscope decision-making[J].Journal of Aerospace Power,2010,25(10):2195-2200.(in Chinese)
|
| [13] |
郭科,陈聆,魏友华.最优化方法及其应用[M].北京:高等教育出版社,2007.
|
| [14] |
沈林成,霍霄华,牛轶峰.离散粒子群优化算法研究现状综述[J].系统工程与电子技术,2008,30(10):1986-1990. SHEN Lincheng,HUO Xiaohua,NIU Yifeng.Survey of discrete particle swarm optimization algorithm[J].Systems Engineering and Electronics,2008,30(10):1986-1990.(in Chinese)
|
| [15] |
汪定伟,王俊伟,王洪峰,等.智能优化方法[M].北京:高等教育出版社,2007.
|