| Citation: | YAN Hua, WU Xiao-yue. Reliability model of TT&C and communication task based on task arc[J]. Journal of Aerospace Power, 2012, 27(12): 2769-2777. |
| [1] |
于志坚.我国航天测控系统的现状与发展[J].中国工程科学,2006,8(10):42-46.YU Zhijian.Status quo and development of spaceflight TT&C systems[J].Engineering Science,2006,8(10):42-46.(in Chinese)
|
| [2] |
夏南银.航天测控系统[M].北京:国防工业出版社,2002.
|
| [3] |
于志坚.载人航天测控通信系统[J].宇航学报,2004,25(3):247-250.YU Zhijian.TT&C and communication system of Chinese manned space flight[J].Journal of Astronautics,2004,25(3):247-250.(in Chinese)
|
| [4] |
Wolman W.A modle for the reliabiltiy estimation of space systems[J].IEEE Transactions on Reliability,1963,12(1):32-39.
|
| [5] |
Pedar A,Sarma V V S.Phased-mission analysis for evaluating the effectiveness of aerospace computing-systems[J].IEEE Transactions on Reliability,1981,30(5):429-437.
|
| [6] |
Mura I,Bondavalli A.Hierarchical modeling & evaluation of phased-mission systems[J].IEEE Transactions on Reliability,1999,48(8):360-368.
|
| [7] |
于志坚.航天测控系统工程[M].北京:国防工业出版社,2008.
|
| [8] |
马顺南,张士峰,刘秋辉,等.靶场测控通信系统可靠性分析[J].飞行器测控学报,2005,24(1):11-16.MA Shunnan,ZHANG Shifeng,LIU Qiuhui,et al.Reliability analysis for TT&C system of missile test range[J].Journal of Spacecraft TT&C Technology,2005,24(1):11-16.(in Chinese)
|
| [9] |
高薇,张强.故障树分析方法在航天测控系统中的应用[C]//中国系统工程学会决策科学专业委员会第六届学术年会论文集.北京:中国系统工程学会,2005:158-162.
|
| [10] |
Burdick G R,Fussell J B,Rasmuson D M,et al.Phased mission analysis:a review of new developments and an application[J].IEEE Transactions on Reliability,1977,26(1):43-49.
|
| [11] |
Esary J D,Ziehms H.Reliability analysis of phased missions[C]//Proceedings of the Conference on Reliability and Fault Tree Analysis.Phildelphia,USA:SIAM,1975:213-236.
|
| [12] |
Alam M,Al-Saggaf U M.Quantitative reliability evaluation of repairable phased-mission systems using Markov approach[J].IEEE Transactions on Reliability,1986,35(5):498-503.
|
| [13] |
Alam M,Song M,Hester S L,et al.Reliability analysis of phased-mission systems:a practical approach[C]//Annual Reliability and Maintainability Symposium.Newport Beach,CA,United States:Institute of Electrical and Electronics Engineers Incorporated,2006:551-558.
|
| [14] |
Kim K,Park K S.Phased-mission system reliability under Markov environment[J].IEEE Transactions on Reliability,1994,43(2):301-309.
|
| [15] |
Shrestha A,Xing L D,Dai Y S.Reliability analysis of multi-state phased-mission systems[C]//Reliability and Maintainability Symposium.Fort Worth,TX,United states:Institute of Electrical and Electronics Engineers Incorporated,2009:151-156.
|
| [16] |
Wang D Z,Trivedi K S.Reliability analysis of phased-mission system with independent component repairs[J].IEEE Transactions on Reliability,2007,56(3):540-551.
|
| [17] |
Dugan J B.Automated analysis of phased-mission reliability[J].IEEE Transactions on Reliability,1991,40(1):45-52.
|
| [18] |
Zang X Y,Sun H R,Trivedi K S.A BDD-based algorithm for reliability analysis of phased-mission systems[J].IEEE Transactions on Reliability,1999,48(1):50-60.
|
| [19] |
Xing L D,Dugan J B.Analysis of generalized phased-mission system reliability,performance,and sensitivity[J].IEEE Transactions on Reliability,2002,51(2):199-211.
|
| [20] |
Somani A K,Ritcey J A,Au S H L.Computationally-efficient phased-mission reliability analysis for systems with variable configurations[J].IEEE Transactions on Reliability,1992,41(4):504-511.
|
| [21] |
Boyd M A.Converting fault trees to Markov chains for reliability prediction[D].NC,US:Duke University,1986.
|
| [22] |
Ross S M.Introduction to probability models[M].[S.l.]:Academic Press,2006.
|
| [23] |
Saad Y.Analysis of some Krylov subspace approximations to the matrix exponential operator[J].SIAM Journal on Numerical Analysis,1992,29(1):209-228.
|