| [1] |
刘新华,张旭堂,刘文剑.基于改进最大-最小蚂蚁系统的多工艺路线决策方法[J].计算机集成制造系统,2008,14(12):2414-2420. LIU Xinhua,ZHANG Xutang,LIU Wenjian.Multi-process routes decision-making methodology based on improved max-min ant system[J].Computer Integrated Manufacturing Systems,2008,14(12):2414-2420.(in Chinese)
|
| [2] |
程光耀,孙厚芳,雷贺功,等.CAPP多工艺方案的模糊综合评价[J].北京理工大学学报,2004,24(3):197-200. CHENG Guangyao,SUN Houfang,LEI Hegong,et al.Fuzzy synthetic estimation of multi-process planning schemes in CAPP[J].Journal of Beijing Institute of Technology,2004,24(3):197-200.(in Chinese)
|
| [3] |
ZHANG Jianfeng,PENG Anhua.Decision-making of slicing scheme in fused deposition modeling processs based on analytical hierarchical process[J].Nanjing University of Aeronautics and Astronautics,2010,27(2):125-130.
|
| [4] |
陈亚哲,刘桂珍,刘挺,等.基于熵权的产品广义质量模糊综合评价[J].东北大学学报2010,2(31):241-244. CHEN Yazhe,LIU Guiz hen,LIU Ting,et al.Comprehensive fuzzy evaluation for generalized product quality based on entropy weight[J].Journal of Northeastern University,2010,2(31):241-244.(in Chinese)
|
| [5] |
Wang M,Wang Z,Wang J.Research on ANN-based machining operation selection for rotational parts[J].Journal of University of Electronic Science and Technology of China,2010,39(2):470-474.
|
| [6] |
Cai N,Wang L,Fenga H Y.GA-based adaptive setup planning toward process planning and scheduling integration[J].International Journal of Production Research,2009,47(10):2745-2766.
|
| [7] |
Li X,Gao L,Shao X,et al.Mathematical modeling and evolutionary algorithm-based approach for integrated process planning and scheduling[J].Computers and Operations Research,2010,4(37):656-667.
|
| [8] |
Guo Y W,Li W D,Mileham A R,et al.Optimisation of integrated process planning and scheduling using a particle swarm optimisation approach[J].International Journal of Production Research,2009,47(14):3775-3796.
|
| [9] |
张丹,左敦稳,焦光明,等.基于粒子群遗传算法的航天产品装配顺序优化方法[J].兵工学报,2010,31(9):1228-1234. ZHANG Dan,ZUO Dunwen, JIAO Guangming,et al.Assembly sequence planning for aerospace products based on particle swarm optimization and genetic algorithm[J].Acta Armamentarii,2010,31(9):1228-1234.(in Chinese)
|
| [10] |
田颖,江平宇,周光辉,等.基于蚁群算法的零件多工艺路线决策方法研究[J].计算机集成制造系统,2006,12(6):882-887. TIAN Ying,JIANG Pingyu,ZHOU Guanghui,et al.Research on part multiple process routes decision making based on ant colony algorithm[J].Computer Integrated Manufacturing Systems,2006,12(6):882-887.(in Chinese)
|
| [11] |
刘英平,高新陵,沈祖诒.基于模糊数据包络分析的产品设计方案评价研究[J].计算机集成制造系统,2007,13(11):2099-2104. LIU Yingping,GAO Xinling,SHEN Zuyi.Product design schemes evaluation based on fuzzy DEA[J].Computer Integrated Manufacturing Systems,2007,13(11):2099-2104. (in Chinese)
|
| [12] |
刘英平,林志贵,沈祖诒.基于改进的数据包络分析模型的绿色产品评价研究[J].中国机械工程,2005,16(20):1809-1813. LIU Yingping,LIN Zhigui,SHEN Zuyi.Study on green product evaluation based on modified data envelopment analysis model[J].China Mechanical Engineering,2005,16(20):1809-1813.(in Chinese)
|
| [13] |
韦韫,李东波,焦光明,等.装配资源重构评价体系研究[J].中国机械工程,2008,19(17):2059-2063. WEI Yun,LI Dongbo,JIAO Guangming,et al.Research on evaluation system for assembling resource reconfiguration[J].China Mechanical Engineering,2008,19(17):2059-2063.(in Chinese)
|
| [14] |
吴坚,梁昌勇,李文年.基于主观与客观集成的属性权重求解方法[J].系统工程与电子技术,2007,29(3):383-387. WU Jian,LIANG Changyong,LI Wennian.Method to determine attribute weights based on subjective and objective integrated[J].Systems Engineering and Electronics,2007,29(3):383-387.(in Chinese)
|
| [15] |
姚倡锋,张定华,卜昆,等.异地协同资源优化配置过程模型及实现[J].计算机集成制造系统,2008,14(3):455-461. YAO Changfeng,ZHANG Dinghua,BU Kun,et al.Collaborative manufacturing resources optimization deployment process model and realization[J].Computer Integrated Manufacturing Systems,2008,14(3):455-461.(in Chinese)
|
| [16] |
门宝辉,梁川.基于变异系数权重的水质评价属性识别模型[J].哈尔滨工业大学学报,2005,37(10):1373-1375. MEN Baohui,LIANG Chuan.Attribute recognition model based variation coefficient weight for evaluating water quality[J].Journal of Harbin Institute of Technology,2005,37(10):1373-1375.(in Chinese)
|