[1] |
WIBOWO A,TJAHJONO B,TOMIYAMA T.Designing contracts for aero-engine mro service providers:models and simulation[J].Procedia CIRP (The International Academy for Production Engineering),2017,59:246-251.
|
[2] |
WONG J S,SCANLAN J P,ERES M H.Modelling the life cycle cost of aero-engine maintenance[R].Belfast,Northern Ireland:the 15th ISPE (International Society of Productivity) International Conference on Concurrent Engineering,2008.
|
[3] |
MULLER M,STAUDACHER S,FRIEDL W H,et al.Probabilistic engine maintenance modeling for varying environmental and operating conditions[R].Glasgow,UK:Turbo Expo:Power for Land,Sea,and Air,2010.
|
[4] |
ACKERT S.Engine maintenance concepts for financiers [EB/OL].[2020-12-10].http:∥www.aircraftmonitor.com/uploads/1/5/9/9/15993320/keeping_score_analysis_of_an_engine%E2%80%99s_sv_v1.pdf.
|
[5] |
STRANJAK A,DUTTA P S,EBDEN M,et al.A multi-agent simulation system for prediction and scheduling of aero engine overhaul[R].Estoril,Portugal:the 7th International Joint Conference on Autonomous Agents and Multiagent Systems (AAMAS),2008.
|
[6] |
MAYORDOMO A F,GHOBBAR A,GHIJS S,et al.Engine management:a decision support tool for strategic engine maintenance planning[R].Fort Worth,US:the 10th AIAA Aviation Technology,Integration,and Operations (ATIO),2013.
|
[7] |
SPIELER S,STAUDACHER S,FIOLA R,et al.Probabilistic engine performance scatter and deterioration modeling[J].Journal of Engineering for Gas Turbines and Power,2008,130(4):150-158.
|
[8] |
KRAFT J,SETHI V,SINGH R.Optimization of aero gas turbine maintenance using advanced simulation and diagnostic methods[J].Journal of Engineering for Gas Turbines and Power,2014,136(11):111601.1-111601.10.
|
[9] |
CROCKER J,KUMAR U D.Age-related maintenance versus reliability centered maintenance:a case study on aero-engines[J].Reliability Engineering and System Safety,2000,67(2):113-118.
|
[10] |
BURKETT M A.DM Trade:a Rolls-Royce tool to model the impact of design changes and maintenance strategies on lifetime reliability and maintenance cost[R].Barcelona,Spain:Turbo Expo:Power for Land,Sea,and Air,2006.
|
[11] |
ESTéBANEZ L R,SHEHAB E,SYDOR P,et al.An integrated aerospace requirement setting and risk analysis tool for life cycle cost reduction and system design improvement[J].Procedia CIRP (The International Academy for Production Engineering),2015,38:78-83.
|
[12] |
WENSKY T,WINKLER L,FRIEDRICHS J.Environmental influences on engine performance degradation[R].Glasgow UK:Turbo Expo:Power for Land,Sea,and Air,2010.
|
[13] |
MILLER J N.Tutorial review:outliers in experimental data and their treatment[J].Analyst,1993,118(5):455-461.
|
[14] |
ACKERT S.Engine maintenance concepts for financiers[J].Aircraft Monitor,2011,2:1-43.
|
[15] |
BURKETT M A.Expanding the reliability process to more accurately assess business risks and opportunities associated with long-term maintenance contracts[R]. Barcelona,Spain:Turbo Expo:Power for Land,Sea,and Air,2006.
|
[16] |
MEEKER W Q,ESCOBAR L A.Statistical methods for reliability data[M].Hoboken,US:John Wiley and Sons,2014.
|
[17] |
CFM公司.中国区CFM56-5B/7B用户发动机管理和工作范围制定报告[R].北京:中国区CFM56-5B/7B用户发动机管理和工作范围制定会议,2008.
|
[18] |
ZARETSKY E V,BRANZAI E V.Rolling bearing service life based on probable cause for removal:a tutorial[J].Tribology Transactions,2017,60(2):300-312.
|
[19] |
ZARETSKY E V,BRANZAI E V.Effect of rolling bearing refurbishment and restoration on bearing life and reliability[J].Tribology Transactions,2005,48(1):32-44.
|
[20] |
CHEN X.Foreign object damage on the leading edge of a thin blade[J].Mechanics of Materials,2005,37(4):447-457.
|